Latest estimate · 2025
A trade-derived number, not a named audited operation.
- 4,800 tonnesUSGS mine estimate derived from Chinese import records1Scale: About 1.2% of estimated 2025 world mine output.

Rare Earth Race · Country Briefing
The estimate equals about 1.2% of 2025 world mine output and comes from Chinese import records, not published Thai mine returns. Thailand's clearest operating asset is a 1,800-tonne-a-year magnet-powder plant, a different production step with no matching global total.
Thailand's clearest rare earth asset is a factory, not a mine. Magnequench's Korat plant has 1,800 tonnes a year of disclosed capacity for neodymium iron boron powder and compounds used in magnets. By contrast, the USGS estimate of 4,800 tonnes of Thai mine output in 2025 comes from Chinese import records and cannot be matched to a named audited operation. 8 1
Kabin Buri could widen the processing role. Its current plan targets 12,000 tonnes a year of mixed rare-earth chloride made mainly from imported African monazite, with ownership and licence changes still pending. It would not prove that Thailand mined the feed or separated individual dysprosium and terbium oxides. 9 We expect imported-feed processing to grow faster than transparent domestic mining through 2030. The national production estimate may be revised again unless regulators publish mine names, grades and contained output. Thailand can become a more useful manufacturing link even while its ranking as a miner remains provisional.
The country in four dates
Reported output, current events, company targets and our forecasts are kept in separate boxes. NdPr means neodymium and praseodymium reported together. Dy/Tb means dysprosium and terbium reported together. NdFeB means neodymium-iron-boron, the most common high-strength permanent magnet.
Latest estimate · 2025
What changed in 2026
Next credible opening
2030 view
Eight strategic metals
That does not mean the country has no projects. It means the public record does not support a like-for-like number for these eight metals.
See the checkProjects first
Neo Performance Materials · Nakhon Ratchasima
Capacity disclosed 10 March 2022; operating footprint checked August 2026
NdFeB powder and compound capacity
Korat is the strongest documented Thai rare earth manufacturing asset. Its powder feeds components made in later factory steps, but the capacity is neither mine output nor a finished sintered-magnet total. 8
Chinese-linked ownership in the last USGS asset record · Ban Khai, Rayong
USGS 2020-2021 industry record; fresh verification needed in 2026
Older planned or reported capacity; 2,000 tonnes a year of metals and alloys also cited
The old yearbook gives a useful asset lead, not proof of current output ready to sell. A current licence and owner should precede any operating label. A production filing would settle the output question. 7
Enuo; Hastings pursuing a 49% interest · Prachinburi
Quarterly update authorized 24 July 2026
Gross mixed chloride design from 10,000 tonnes a year of African monazite feed
The expanded design and feed agreement create a defined route. Transaction close and licence changes still sit ahead of trial production, with the first quarter of 2027 as the company target. 9
Thailand Department of Mineral Resources (DMR) inventory and various legacy mine areas · Southern Thailand
DMR sources accessed 27 August 2026
Monazite and xenotime in placer or tailings systems
Jarin tin operation and research partners · Kanchanaburi
Study published 3 May 2024
Accessory monazite and xenotime
The minerals occur in the tin system, though recovery and product economics remain unproven. It belongs in exploration rather than supply. 6
Material by material
Each card begins with the finding. The numbers and their limits sit underneath it.
Indicative domestic midpoints, 28 August 2026, per kilogram
Strategic metals beyond rare earths
Each card states the type of output and year. The bars compare this country with the market leader at the same step whenever the data allows it. A data gap is not zero.
The conversion test
A deposit is only the first step. Statuses below describe operating capability at the data cut-off, not announced ambition.
USGS reports 4,800 tonnes of rare-earth oxide for 2025 but names no mine. DMR documents prospects and legacy tin associations rather than a national operation matching that output. 1 3
Kabin Buri is planned to turn African monazite into mixed rare earth chloride. The company moved its first-output target to the first quarter of 2027 after the design doubled. 9
An older USGS yearbook describes Xinyuan's Rayong oxide and metals plant. Current ownership and licence need fresh verification before the asset is called operating, along with output ready to sell. 7
Magnequench Korat has 1,800 tonnes a year of disclosed NdFeB powder or compound capacity. The facility belongs at the alloy-material step rather than the mine gate. 8
Korat supplies bonded-magnet materials, while the cited sources do not establish a large Thai sintered-magnet chain. Powder capacity should not be relabelled as finished magnets. 8
The numbers
USGS 2025 estimates cover total rare earth oxide equivalent. The chart does not measure refining or magnet output.
USGS estimates 4,800 tonnes of Thai mine output for 2025, equal to many times the combined estimate for Malaysia and Vietnam. 1 All three national estimates come from China's import data rather than audited mine returns, which leaves the bar-chart comparison without firm footing.
The prior-year revision is large enough to change a trend. USGS commodity summary 2025 had put Thailand's 2024 output at 3,000 tonnes. 2 The USGS commodity summary 2026 edition revised the same period to 2,100 tonnes. That lower base makes the new 4,800-tonne estimate look even steeper.
Reserve reporting moved in the other direction, from 4,500 tonnes in the 2025 USGS edition to "not available" a year later. 2 1 That label means the evidence is unavailable rather than a country with no rare earth occurrence.
Small-mine growth or recovery from old tin streams could raise exports. Customs totals can also shift when inventory moves or material is re-exported. Those explanations remain hypotheses until a concession-level mass balance links ore grade to product and border record.
The most quotable Thai number is also the least attributable. A mine name would improve it more than another decimal place.
What the numbers say
Thailand's DMR describes monazite and xenotime in onshore or offshore tin tailings across the south. The same heavy-mineral assemblages occur near granite or gneiss in provinces including Ranong and Phuket. 4 Historical waste can reduce fresh stripping, though variable grade and ownership complicate a restart.
The Western Belt's S-type granitoids provide a second route because DMR research identifies them as favorable hosts for tin-tungsten-rare earth systems. Tropical weathering can concentrate rare earth minerals or adsorb ions on clay. 3 A favorable host is an exploration filter rather than an economic reserve.
Work at Ranong and Takua Pa found enriched rare earths in altered granite or separated kaolinite, including heavier elements. 5 Those samples justify follow-up drilling and leach tests, but a production forecast still needs thickness and recovery. Land access would then decide whether that forecast can become a project.
Jarin in Kanchanaburi adds monazite or xenotime as accessory minerals in a tin setting. 6 By-product recovery may improve an existing mine's economics, but an accessory grain does not become carbonate ready to sell by appearing under a microscope.
Neo Performance Materials disclosed 1,800 tonnes a year of NdFeB powder or compound capacity at Magnequench Korat in its 2022 annual information form. 8 Three melt-spinning jet casters place the site between metals and bonded magnet components, which is a real manufacturing position even without a mine.
NdFeB powder can feed bonded magnets, while a customer-approved sintered magnet follows a different pressing and heat-treatment route. A chart that calls all 1,800 tonnes finished magnets would skip the customer's most demanding steps.
Using imported African monazite, Hastings' Kabin Buri proposal doubled its design in July 2026 to 10,000 tonnes a year of feed. The plan also targets 12,000 tonnes of gross mixed chloride, with first output due in the first quarter of 2027. 9 Mixed chloride at a stated 45% total rare-earth oxide can weigh more than its feed because reagents and water become part of the product.
The company was still finalizing its 49% acquisition and revised transaction documents, with licence amendments also pending. 9 Only a commercial shipment should move the plant into the operating column, because early trial production can make a few drums long before a customer accepts steady chemistry.
Washington and Bangkok signed a critical-minerals memorandum of understanding in October 2025 covering governance and mapping. Investment cooperation also sits inside the same framework for both governments. Either side may discontinue it, and the text grants no mine right. 10 Thailand's government later stressed that normal environmental review and consultation still apply. 11
The agreement can improve geological evidence or project finance, but it cannot turn a DMR map into production. A funded survey and reserve statement would be measurable progress; another ministerial meeting belongs in the policy timeline.
Water has become the sharper public issue after Reuters reported arsenic in the Kok River, alongside signatures of dysprosium and terbium. China-backed mines farther along the rivers in Myanmar were identified as the source of concern. 13 Thai task forces monitored the damage while farmers shifted away from river irrigation.
The Associated Press documented the wider fear around fish and food exports in April 2026. 14 Those impacts belong on a Thailand page because the costs reach Thailand through the rivers. They should be labelled as cross-border pollution rather than evidence against a named Thai mine.
Government help
Loans, grants, guaranteed buyers and minimum prices can help a project get built. A promise counts only when the money or contract is committed.
| Measure | What it does | Who receives it | Will it move the project? |
|---|---|---|---|
| US-Thailand minerals memorandum of understanding | Cooperation on investment and diversified supplyThe agreement supports policy coordination rather than granting projects automatic rights. | Qualified Thai and allied projects selected later. | A framework, not a mine permitNamed finance and licences must follow before capacity changes. 10, 11 |
| Mining and factory approvals | Project-specific national permissionsThailand clarified that the memorandum of understanding creates no mining rights. | Kabin Buri and any future domestic mine or processor. | The domestic licence still controlsForeign backing does not bypass environmental or operating approvals. 11, 9 |
| Kabin Buri transaction | Private cross-border feed and plant investmentHastings is pursuing a 49% interest and a revised mixed-chloride design. | A processor using African monazite rather than Thai mine feed. | A defined route, not operating outputTransaction close, licences, construction and customer qualification remain. 9 |
| Cross-border water risk | Environmental enforcement around upstream feedEvidence links rare-earth leaching in the region to contaminated Mekong tributaries. | Thai communities, agriculture and processors exposed to tainted supply. | Traceability can become a trade conditionNo price floor compensates for unlawful origin or water damage. 13, 14 |
EarthRarest forecast
These are dated editorial predictions, not company guidance or investment advice. Each includes the evidence that would force a rethink.
Across USGS commodity summary editions 2027 to 2030
USGS revises at least one Thailand annual mine-output estimate by more than 20% between successive vintages. The same 2024 estimate moved from 3,000 to 2,100 tonnes in one year, while the reserve field disappeared. A customs proxy stays exposed until Thailand publishes mine-level output. 2 1
Lower confidence if Thailand publishes named-mine contained-rare-earth oxide data reconciled to customs. This forecast is wrong if the USGS 2030 commodity summary does not revise any annual estimate by more than 20%.
By 31 December 2027
Kabin Buri makes its first commercial mixed rare-earth chloride shipment, predominantly from imported African feed. The latest filing gives a plant design and contracted feed route, though acquisition completion and licence amendments still gate construction. 9
Revise on transaction close and the amended licence. This forecast is wrong if the plant is cancelled, relocated or ships nothing by the deadline.
Through 31 December 2030
Thailand has no named domestic rare earth mine reporting more than 1,000 tonnes of rare-earth oxide in a calendar year. DMR shows real occurrences, but the current national production estimate has no matching operator or reserve. The visible industrial projects use imported feed or external alloy inputs. 3 1
Revise when a concession publishes a reserve, environmental review and funded construction plan. This forecast is wrong if audited mine output rises above 1,000 tonnes of rare-earth oxide.
Method and evidence
Keep following the supply chain
These links follow raw material, processing, buyers and policy. They are not an alphabetical reading list.
Continue when you’re ready
Talk through the metals, the buying process, storage or resale with EarthRarest.