Rare earth projects tracker

Compare 103 project, facility and operating-chain records across 20 country briefings. Each row preserves its reported status, product basis, conditions and source links.

This is a dated consolidation, not a fresh October status check. “Producing now” and similar status labels describe the original briefing's cutoff. Check the linked source and newer company disclosures before relying on a project milestone.

Read the product before comparing the amount

A tonne of ore, mixed carbonate, contained rare-earth oxide, separated oxide, metal or magnet describes a different stage. Planned capacity is not actual output. Linked mines and processing plants may use the same material, so adding their figures would double-count supply. This tracker deliberately publishes no total capacity.

Operators and locations retain the source's wording. Australia's source table supplies locations without a separate operator field. First-production dates appear only when present in the original row; conditions and dates remain attached to the claim. The tracker is not a complete list of every project worldwide.

Download tracker CSV · Download tracker JSON with methodology

Project and facility records

103 records

Reported project positions at each original briefing cutoff
Project, operator or locationReported statusProduct and amount, original basisConditions and dependenciesCutoff and sources
Longonjo Stage 1

Pensana 84%; Angola's sovereign wealth fund (FSDEA) 10%; other investors 6% · Near Longonjo, Huambo Province

Angola briefing
Under construction 22% complete as of 8 June 202620,000 tonnes a year of mixed rare-earth carbonate Stage 1 product mass, not contained rare-earth oxide

Earthworks and site facilities were real, while the US$150 million balance had not been received by the cut-off. That delay put the 2027 trial production target under pressure.

Cutoff: 2026-08-27
Sources and original notes
Longonjo heavy rare earth circuit

Pensana · Longonjo processing plant

Angola briefing
Study only Target disclosed 8 June 2026>122 tonnes a year of Dy/Tb Optimization target; not current designed output

The ore contains strategic heavy rare earths, but the higher-recovery circuit still needs engineering and commercial proof. Do not convert its target into operating supply.

Cutoff: 2026-08-27
Sources and original notes
Longonjo Stage 2

Pensana · Huambo Province

Angola briefing
Study only Year-four target restated June 202640,000 tonnes a year of mixed rare-earth carbonate Expanded product-mass target

Stage 2 doubles the first train's headline output. It depends on Stage 1 reaching steady output, fresh capital and buyers, leaving the 2029 timing outside the most likely forecast.

Cutoff: 2026-08-27
Sources and original notes
Lobito Atlantic Railway

Lobito Atlantic Railway concession; U.S. International Development Finance Corporation (DFC) lender · Lobito to Angola's eastern border

Angola briefing
Under construction US$553 million loan signed 17 December 20251,300 km corridor Transport capacity, not rare earth output

The corridor gives Longonjo an export route and Western policy relevance. Mine-specific loading, tariffs and service reliability still need contracts.

Cutoff: 2026-08-27
Sources and original notes
Toyota Tsusho and TREI route

Toyota Tsusho; Toyotsu Rare Earths India · India later-processing route

Angola briefing
Study only Restated 8 June 2026Up to 20,000 tonnes a year of mixed rare-earth carbonate Five-year contemplated intake

The route could absorb Stage 1 output through an established Japanese-linked processor. Pricing and binding minimum volumes were not final in the cited update.

Cutoff: 2026-08-27
Sources and original notes
ReElement and VAC/eVAC route

ReElement Technologies and VAC/eVAC · Indiana and South Carolina, United States

Angola briefing
Study only Restated 8 June 2026No binding volume disclosed Proposed U.S. separation-to-magnet branch

The agreements make the U.S. strategy visible, but a memorandum-of-understanding diagram is not a shipment. Qualification and finance conditions need to close before it becomes a chain that lenders can finance.

Cutoff: 2026-08-27
Sources and original notes
Mt Weld and Kalgoorlie

Western Australia

Australia briefing
Producing nowMined in Australia: 29,000 tonnes in 2025 Lynas products later made in Malaysia: 13,089 tonnes in the 2026 financial year

Earliest supply: Now Large-scale operating chain

Kalgoorlie makes mixed carbonate. Lynas's reported oxides ready to sell are separated and finished in Malaysia. Source

Cutoff: 2026-08-28
Sources and original notes
Balranald

New South Wales

Australia briefing
Producing nowActual 2026 output not yet published Earlier full-rate estimate: about 4,000 tonnes a year of concentrate; not finished rare-earth chemicals

Earliest supply: Mining began January 2026 Rare-earth raw material follows the refinery schedule

Monazite-rich mineral sands are intended for Eneabba. Current project , estimate

Cutoff: 2026-08-28
Sources and original notes
Eneabba refinery

Western Australia

Australia briefing
Under constructionFull-rate project case: 15,100 tonnes a year Includes 3,300 tonnes of neodymium-praseodymium. The 23,000-tonne maximum needs enough suitable raw material; neither figure is 2027 output

Earliest supply: Testing in 2027 First contracted deliveries in 2028

Turns stockpile and mined raw material into oxides in Australia. It is a processor, not extra mine supply. Case , schedule

Cutoff: 2026-08-28
Sources and original notes
Nolans

Northern Territory

Australia briefing
Funded; mobilisation under way4,440 tonnes of neodymium-praseodymium chemicals Full design output, plus about 570 tonnes of combined middle and heavy rare-earth products in the economics case

Earliest supply: Major construction targeted from September 2026 Mid-2029 first-product target

Mine, chemical treatment and oxide separation are planned on one Australian site. Decision , output

Cutoff: 2026-08-28
Sources and original notes
Browns Range

Western Australia

Australia briefing
Waiting for money or permits17,500 tonnes of partly processed ore Study estimate containing about 4,350 tonnes of rare-earth material, rich in dysprosium and terbium

Earliest supply: Late 2028 or early 2029 target Conditional on a build decision and finance

Planned raw material for Eneabba. Important for material mix, not just tonnes. Study , schedule

Cutoff: 2026-08-28
Sources and original notes
Yangibana

Western Australia

Australia briefing
Waiting for money or permits31,570 tonnes of partly processed ore Study estimate containing 8,524 tonnes of rare-earth material and 3,090 tonnes of neodymium and praseodymium

Earliest supply: About two years after engineering and construction award Decision and finance still required

Large study figure, but excluded from the central 2030 case until a build is funded. Source

Cutoff: 2026-08-28
Sources and original notes
Dubbo

New South Wales

Australia briefing
Waiting for money or permits1,242 tonnes of individual rare-earth chemicals Earlier study case. The current product route is being reviewed

Earliest supply: No dependable date Design may change

Could make mixed or separated products. Earlier case , review

Cutoff: 2026-08-28
Sources and original notes
Donald

Victoria

Australia briefing
Waiting for money or permits8,500 to 9,500 tonnes of partly processed ore Current company production target

Earliest supply: 2028 company target Conditional on a final build decision and debt finance

Concentrate is intended for separation in Utah, United States. Source

Cutoff: 2026-08-28
Sources and original notes
Goschen

Victoria

Australia briefing
Waiting for money or permits8,320 tonnes of partly processed ore Agreement average containing about 4,900 tonnes of rare-earth material

Earliest supply: No dependable date Environmental approval is in place; a final build decision and finance remain conditions

Intended raw material for Eneabba. Do not add its contained tonnes to Eneabba output. Source

Cutoff: 2026-08-28
Sources and original notes
Pela Ema

Serra Verde; USA Rare Earth acquisition pending at the data cut-off · Goias

Brazil briefing
Producing now Since January 2024More than 5,000 tonnes a year of mixed rare-earth carbonate Original full-output plan; 6,400-tonne-a-year target by the end of 2027

Brazil's only commercial rare earth mine is the reference case. The expansion, change of ownership and long-term US purchase agreement remained forward-looking on 27 August 2026.

Cutoff: 2026-08-27
Sources and original notes
Carina

Aclara Resources · Goias

Brazil briefing
Waiting for money or permits Feasibility study filed in April 20264,378 tonnes a year of mixed rare-earth carbonate Company feasibility case

A pilot plant and filed study reduce technical uncertainty, but environmental approval, finance and construction still gate the 2028 target.

Cutoff: 2026-08-27
Sources and original notes
Caldeira

Meteoric Resources · Minas Gerais

Brazil briefing
Study only Preliminary study August 2025; POSCO pact July 202613,584 tonnes a year of mixed rare-earth carbonate Preliminary-study production case

The largest near-term proposal has a serious strategic partner but no final investment decision. Its company schedule should be read as conditional.

Cutoff: 2026-08-27
Sources and original notes
Colossus

Viridis Mining and Minerals · Minas Gerais

Brazil briefing
Testing output Preliminary study July 2025; demo active in 2026About 9,500 tonnes a year of mixed rare-earth carbonate Preliminary-study concept

The demonstration centre can produce customer samples. It does not prove that a full-scale mine will meet the company's end-of-2028 schedule.

Cutoff: 2026-08-27
Sources and original notes
Monte Alto

Brazilian Rare Earths · Bahia

Brazil briefing
Study only Trial licence June 2026Annual trial cap: 2,000 tonnes Sampling allowance, not commercial output

High-grade results justify more work. A trial mining limit and drilling programme are not a reserve, financed plant or production forecast.

Cutoff: 2026-08-27
Sources and original notes
MagBras

Brazilian research and industrial consortium · Minas Gerais

Brazil briefing
Evidence limited Government visit May 2026No commercial tonnes disclosed Magnet development and recycling work

MagBras can preserve process knowledge and train a workforce. It is not evidence of a scaled domestic sintered magnet industry.

Cutoff: 2026-08-27
Sources and original notes
Wicheeda

Defense Metals · British Columbia

Canada briefing
Study only Feasibility and infrastructure work under wayAbout 5,200 tonnes a year of mixed rare-earth carbonate Saleable mixed carbonate on an oxide-equivalent basis in the company study; the mine would also make a larger concentrate stream

Wicheeda is Canada's leading mine proposal. An early study estimates US$1.44 billion to build it. It still needs detailed engineering, permits, roads, power and construction finance.

Cutoff: 2026-08-30
Sources and original notes
Tardiff at Nechalacho

Vital Metals · Northwest Territories

Canada briefing
Study only Detailed study was targeted for 2026; no mine build had started by the data cut-off56,000 tonnes a year of partly processed ore Early plan for partly processed ore containing 26.4% rare-earth oxide

Tardiff is a new mine proposal, not a restart of the stopped North T pilot. Only an early study exists. Lenders still need a detailed cost study before they can consider financing construction.

Cutoff: 2026-08-30
Sources and original notes
  • Nechalacho Scoping StudyNechalacho Scoping Study , Vital Metals, 28 July 2025. Tardiff starter concept, capital estimate and output design.
Strange Lake

Torngat Metals · Quebec and Labrador

Canada briefing
Waiting for money or permits Assessment active August 202617,000 tonnes of ore a day Mine, processing plant, road and coastal export route planned together

A long access road and new coastal route make infrastructure part of the project itself. C$165 million of announced loans supports preconstruction work, not a fully financed mine build.

Cutoff: 2026-08-30
Sources and original notes
Ashram

Mont Royal Resources · Nunavik, Quebec

Canada briefing
Study only A preliminary study is the next step17,466 tonnes a year of mixed rare-earth carbonate, oxide equivalent Company study, including 4,035 tonnes a year of neodymium-praseodymium

A 2026 company study estimates C$1.231 billion to build the mine, excluding the access road. It still needs a more detailed study, permits and finance, making production before 2030 unlikely.

Cutoff: 2026-08-30
Sources and original notes
SRC Rare Earth Processing Facility

Saskatchewan Research Council · Saskatoon, Saskatchewan

Canada briefing
Testing output Commercial intake targeted in the third quarter of 2027525 tonnes a year of neodymium-praseodymium metal Funded-upgrade design reported in August 2026; capacity is not 2027 output

SRC is Canada's processing plant closest to regular production. It plans to make neodymium-praseodymium metal and recover dysprosium and terbium. Buyer contracts cover most planned output, but the plant still has to prove that it can run steadily and supply paying customers.

Cutoff: 2026-08-30
Sources and original notes
RapidSX demonstration plant

Ucore Rare Metals · Kingston, Ontario

Canada briefing
Testing output Verified August 2026No annual output published A high-purity sample proves the chemistry, not continuous production

The plant has proved that it can make a high-purity sample. It has not proved that a full-size factory can run continuously and deliver material accepted by paying customers.

Cutoff: 2026-08-30
Sources and original notes
Bayan Obo integrated system

China Northern Rare Earth and Baotou Steel group companies · Baotou, Inner Mongolia

China briefing
Producing now Status filed 18 April 2026Mine feed and separated oxides The anchor of China's northern light-rare-earth cluster

The group reported record operating volumes for 2025 but withheld the detailed published product breakdown under secrecy provisions. That makes the asset strategically central and unusually difficult to model from public data.

Cutoff: 2026-08-27
Sources and original notes
Northern Rare Earth green smelting upgrade

China Northern Rare Earth · Baotou, Inner Mongolia

China briefing
Operating; expansion building Status filed 18 April 2026Cleaner separation and refining Phase two remained under construction

The approved investment ceiling is RMB 7.799 billion. This is an expansion at an operating site inside an operating cluster, so it carries less integration risk than a remote new refinery built from scratch.

Cutoff: 2026-08-27
Sources and original notes
JL MAG operating magnet base

JL MAG Rare-Earth · Jiangxi and Baotou operations

China briefing
Producing now Status filed 1 April 2026High-performance neodymium-iron-boron (NdFeB) magnets Serving vehicles and industrial motors, including wind systems

Designed annual capacity stood at 40,000 tonnes at the end of 2025. Utilization exceeded 90 percent, which separates this operation from the many announced lines elsewhere that have not yet won customer approval.

Cutoff: 2026-08-27
Sources and original notes
JL MAG Baotou Phase III

JL MAG Rare-Earth · Baotou, Inner Mongolia

China briefing
Under construction Status filed 1 April 2026Additional sintered NdFeB capacity Built beside a mature materials cluster

The phase adds 20,000 tonnes of annual high-performance magnet capacity. Management targets total designed capacity of 60,000 tonnes by the end of 2027.

Cutoff: 2026-08-27
Sources and original notes
Ganzhou metal and alloy relocation

China Rare Earth Group subsidiary · Ganzhou, Jiangxi

China briefing
Study only Approval published 7 May 2025Rare earth metals and alloys A processing project, not a new mine

The approved project is designed for 8,000 tonnes of rare earth metals and alloys a year. Its value lies between oxide separation and magnets, the part of the chain many rival countries still send abroad.

Cutoff: 2026-08-27
Sources and original notes
Daping heavy rare earth prospect

China Rare Earth Group · Lanshan County, Hunan

China briefing
Study only Proposed transfer published 17 October 2025Heavy rare earth exploration No commercial production declared

Hunan proposed transferring the exploration right to China Rare Earth Group. The project may improve domestic heavy-feed options, but an exploration title should not be counted as mine supply.

Cutoff: 2026-08-27
Sources and original notes
Tanbreez

Critical Metals Corp 92.5%; European Lithium 7.5% · Killavaat Alannguat, South Greenland

Greenland briefing
Study only Technical report 13 April 202615,000 tonnes a year of concentrate Latest Phase 1 design claim, not current production

A 30-year exploitation licence and community-benefit agreement are important assets. Greenland approved the transfer that took Critical Metals to 92.5% in April 2026. The current technical report still describes advanced exploration and resource delineation, with no mineral reserve or funded construction decision.

Cutoff: 2026-08-27
Sources and original notes
Tanbreez acceleration program

Critical Metals Corp · South Greenland

Greenland briefing
Study only Announced 10 March 2026First export targeted for the third quarter of 2029 Company target after first ore around late 2028 or early 2029

The US$30 million program advances field work and project definition. It does not cover the full cost of building the mine, formal approval to build or proof that all licence conditions are complete.

Cutoff: 2026-08-27
Sources and original notes
Ucore Louisiana purchase agreement

Ucore Rare Metals · Louisiana, United States

Greenland briefing
Testing output Agreement 26 August 2025Up to 10,000 tonnes a year of feed Heavy rare earth concentrate contemplated for 10 years

Ucore provides a U.S. separation route backed by Department of Defense support. Its own move to steady output and testing of representative Tanbreez feed remain dependencies.

Cutoff: 2026-08-27
Sources and original notes
REalloys purchase agreement

REalloys and Critical Metals Corp · United States supply chain

Greenland briefing
Contract signed; first delivery pending Signed 21 May 202615% of Phase 1 15-year term after first delivery; customer testing required

The contract is stronger than a memorandum of understanding, but the agreement can be cancelled if first delivery is not made within five years and the later-processing route must still make products accepted by customers.

Cutoff: 2026-08-27
Sources and original notes
Kvanefjeld / Kuannersuit

Energy Transition Minerals claimant · Near Narsaq, South Greenland

Greenland briefing
Stopped or blocked Exploration renewal rejected 26 June 2026No valid output case The project has no legal construction or production path under current rules

The 2023 exploitation refusal, 2025 arbitration outcome and 2026 renewal rejection leave the uranium-bearing project legally stranded under current law.

Cutoff: 2026-08-27
Sources and original notes
OSCOM mineral-sands complex

IREL (India) Ltd · Chatrapur, Odisha

India briefing
Producing now Verified August 20267.5 million tonnes of sand a year Mineral-sands throughput, not rare earth output

OSCOM supplies the state chain and hosts rare earth extraction, but its large mining figure covers the full sand stream. National 2025 mine output was only 2,900 tonnes of rare-earth oxide equivalent on the comparable USGS basis.

Cutoff: 2026-08-27
Sources and original notes
  • OSCOMOSCOM , IREL (India) Ltd, Accessed 27 August 2026. Mineral-sands throughput, product capacity and integrated extraction role.
  • Mineral Commodity Summaries 2026: Rare EarthsMineral Commodity Summaries 2026: Rare Earths , U.S. Geological Survey, 6 February 2026, version 1.3 May 2026. India production, current Not available reserve entry and world comparison.
Rare Earth Extraction Plant

IREL (India) Ltd · Odisha

India briefing
Producing now Current chain verified August 2026Mixed rare earth chloride Intermediate product made from recovered monazite

The plant cracks monazite and moves India beyond mineral concentrate. Feed remains limited by coastal mine access, with government reporting actual monazite production around 4,000 tonnes a year.

Cutoff: 2026-08-27
Sources and original notes
  • OSCOMOSCOM , IREL (India) Ltd, Accessed 27 August 2026. Mineral-sands throughput, product capacity and integrated extraction role.
  • Production of monazite and rare-earth compoundsProduction of monazite and rare-earth compounds , Press Information Bureau and Department of Atomic Energy, 2022. Actual monazite production and land or environmental feed constraints.
Rare Earths Division, Aluva

IREL (India) Ltd · Kerala

India briefing
Producing now Product slate verified August 2026>99% separated oxides Mainly light rare earths; the basis of the stated 4,000-tonne figure is unclear

Aluva proves that India can make individual high-purity oxides. The public statement does not say which period or product its capacity figure covers, so no annual saleable output can be calculated.

Cutoff: 2026-08-27
Sources and original notes
  • Rare Earths Division, AluvaRare Earths Division, Aluva , IREL (India) Ltd, Accessed 27 August 2026. High-purity oxide slate and ambiguous capacity statement of 4,000 metric tonnes.
Sintered rare-earth permanent magnet manufacturing scheme

Ministry of Heavy Industries and selected firms · Sites pending beneficiary selection

India briefing
Study only 20 bids reported 13 August 2026NdFeB magnet target: 6,000 tonnes a year Policy ceiling, not installed capacity

The program is meant to convert oxide into metal, then metal into alloy and finished magnets. Strong bidder interest still leaves beneficiary awards and construction ahead. Lengthy customer testing follows.

Cutoff: 2026-08-27
Sources and original notes
Puri and Brahmagiri mineral-sands expansion

IREL joint ventures · Odisha

India briefing
Study only Portfolio status August 2026No rare-earth oxide figure disclosed Feed expansion projects without a public schedule

Puri is listed under implementation, while Brahmagiri still needs statutory mining-lease clearances. Their contribution should remain unmodelled until IREL publishes product basis and timing.

Cutoff: 2026-08-27
Sources and original notes
  • Projects Under ImplementationProjects Under Implementation , IREL (India) Ltd, Accessed 27 August 2026. Puri project, Tamil Nadu field survey and Brahmagiri clearance work.
Nawatola-Laband rare earth block

Hindustan Zinc Exploration Services · Uttar Pradesh

India briefing
Study only Surface work began in the final quarter of the 2026 financial yearNo reserve or mine plan Composite licence pathway, not production

This is the clearest private hard-rock exploration milestone. It has no reported reserve or processing tests yet, so even a mine-development timetable would be premature.

Cutoff: 2026-08-27
Sources and original notes
Caremag

Carester with Japan's state minerals agency and Iwatani support · Lacq, France

Japan briefing
Under construction Japan-France roadmap reaffirmed 1 April 2026About 20% of Japan's future Dy/Tb demand Japan's industry ministry expectation under long-term supply, not current output

Japanese and French public backing targets recycled magnets and primary feed. Trial production and heavy-oxide output ready to sell remain the commercial tests.

Cutoff: 2026-08-27
Sources and original notes
Minamitorishima rare-earth mud

Japan's marine science agency and the national ocean programme · Japan's exclusive economic zone, western Pacific

Japan briefing
Testing output Results published 24 July 2026About 50 tonnes of mud recovered Three-day test material, not rare-earth oxide product

Continuous lifting from a 5,569-metre pipe depth is a genuine engineering milestone. A longer 2027 test and March 2028 economic assessment stand between this result and any industrial decision.

Cutoff: 2026-08-27
Sources and original notes
Mandena and Port Ehoala

QIT Madagascar Minerals · Fort Dauphin, Anosy

Madagascar briefing
Producing now Verified August 20262,700 tonnes of national rare-earth mine output USGS 2025 country estimate, not QMM reported output

Rio Tinto's QIT Madagascar Minerals (QMM) operation is the established monazite route, but the exact 2025 company contribution is not separately reported in the USGS table. Current product leaves through Port Ehoala before individual oxide separation.

Cutoff: 2026-08-27
Sources and original notes
  • Mineral Commodity Summaries 2026: Rare EarthsMineral Commodity Summaries 2026: Rare Earths , U.S. Geological Survey, 6 February 2026, version 1.3 May 2026. Country production, estimation method and reserve status.
  • QIT Madagascar MineralsQIT Madagascar Minerals , Rio Tinto, Current at 27 August 2026. Operating products and Port Ehoala route.
Ampasindava

Harena Resources · Ampasindava Peninsula

Madagascar briefing
Study only Mining terms signed 11 August 2026About 4,000 tonnes a year of total rare-earth oxide Preliminary study forecast, including about 1,700 tonnes a year of combined NdPr, Dy and Tb

A completed preliminary study and U.S. International Development Finance Corporation (DFC) development grant move Ampasindava beyond a resource story. Environmental approval, full construction finance and formal approval to build remain requirements before the mid-2028 company target.

Cutoff: 2026-08-27
Sources and original notes
Vara Mada

Energy Fuels · Atsimo-Andrefana

Madagascar briefing
Waiting for money or permits Verified June quarter 2026Monazite from 2029 target Company schedule; intended for White Mesa in Utah

The suspension is lifted, but monazite is not yet included in the exploitation permit. Fiscal terms, full construction finance and formal approval to build also remain outstanding, so the early-2029 delivery case is still conditional.

Cutoff: 2026-08-27
Sources and original notes
Kenering non-radioactive rare earths mine

Perak state and private operating structure · Hulu Perak

Malaysia briefing
Producing now Operating since September 2022; regulator status March 20265,139 tonnes of rare-earth carbonate Gross cumulative carbonate through August 2023

Kenering remains Malaysia's only fully approved operating rare earth mine. The reported carbonate mass needs assay before it can be compared with USGS contained-rare-earth oxide output.

Cutoff: 2026-08-27
Sources and original notes
Lynas Malaysia

Lynas Rare Earths · Gebeng, Pahang

Malaysia briefing
Producing now Ten-year licence effective 3 March 202613,089 tonnes of rare-earth oxide 2026 financial-year company-wide ready-for-sale total; separation in Malaysia

The facility is an operating ex-China separator with Dy and Tb capability. Its feed is predominantly Australian, so the production line belongs beside Malaysian processing rather than local mining.

Cutoff: 2026-08-27
Sources and original notes
Lynas heavy rare earth expansion

Lynas Rare Earths · Gebeng, Pahang

Malaysia briefing
Study only Announced October 2025; pending approvals as of August 2026Feed capacity: up to 5,000 tonnes a year Heavy-feed capacity, not finished oxide tonnes

A$180 million of proposed investment would widen the product slate. Construction timing still depended on regulatory approval and a purchase agreement.

Cutoff: 2026-08-27
Sources and original notes
JS Link Kuantan magnet factory

JS Link with Lynas partnership · Kuantan, Pahang

Malaysia briefing
Funded, work not started Partnership announced 6 July 20263,000 tonnes a year of neodymium-iron-boron (NdFeB) magnets Planned design, no commercial output yet

The supply agreement and Lynas investment make this more concrete than a loose memorandum of understanding. Site construction and shipments accepted by customers remained ahead.

Cutoff: 2026-08-27
Sources and original notes
Carester-Malaco Perak project

Carester and Malaco Mining Group · Perak

Malaysia briefing
Waiting for money or permits Joint venture detailed 6 July 2026About 13,000 tonnes a year Proposed separation capacity; product basis not fully disclosed

The partners were still seeking mining permission and gave no cost or schedule. Technology transfer may matter later, but no tonnes belong in a most likely supply forecast yet.

Cutoff: 2026-08-27
Sources and original notes
Jelebu non-radioactive rare earths proposal

Applicant under state and federal review · Ulu Klawang and Ulu Triang, Negeri Sembilan

Malaysia briefing
Waiting for money or permits Environmental review received December 2025; status reported March 2026No approved output 357-hectare application

A filed environmental review is evidence of movement, not a mine approval. The project still needs an environmental decision and operating mining scheme.

Cutoff: 2026-08-27
Sources and original notes
Pangwa-Chipwi ion-adsorption belt

Multiple Chinese-linked and local operators; Kachin Independence Organization and its armed wing control access · Kachin State

Myanmar briefing
Operating, but disrupted Kachin Independence Army control since October 2024; status checked August 2026No audited mine total Core heavy rare earth feed district

The belt can restart in sections, though tax terms and Chinese technicians decide how much material crosses the border. Reuters' estimate that the region supplies roughly half of the world's mined heavy rare earths describes the wider supply role rather than audited capacity.

Cutoff: 2026-08-27
Sources and original notes
Mong Hsat-Mong Yun sites

Ownership unverified; United Wa State Army protection and Chinese-speaking operators · Eastern Shan State

Myanmar briefing
Producing now Satellite and field evidence to June 2025No audited tonnes More than 12 pools at one site and 20 at another

Physical growth is visible, but Reuters could not identify the legal owners. The sites appear to be a substitute for disrupted Kachin feed while remaining tied to Chinese expertise and customers.

Cutoff: 2026-08-27
Sources and original notes
India-facing Kachin supply route

No committed operator · Kachin to northeast India

Myanmar briefing
Study only Contact with state-owned Indian Rare Earths Limited (IREL) reported in December 2024; no commercial route by August 20260 verified tonnes a year No audited shipment or named separator

Mountain logistics and limited Indian heavy separation capacity keep this below project status. U.S.-linked pitches also lacked a decision and a workable supply chain.

Cutoff: 2026-08-27
Sources and original notes
Hasetins Uke expansion

Hasetins Commodities · Uke, Nasarawa State

Nigeria briefing
Under construction Government inspection 18 June 2026Claimed addition of 12,000 tonnes a year Product and feed basis not disclosed

Government and press accounts support a physical construction project. They do not establish that the stated capacity is rare-earth oxide-equivalent output, so it remains outside current supply totals.

Cutoff: 2026-08-27
Sources and original notes
Hasetins existing operation

Hasetins Commodities · Nasarawa State

Nigeria briefing
Output claimed, not verified Claim reported 18 June 2026Claimed capacity of 6,000 tonnes a year No public product specification or audited output found

The claimed 6,000-tonne existing operation and 12,000-tonne expansion create the wider 18,000-tonne figure, 12 times the USGS mine estimate. It should remain separate from mine output and market-share totals until feed, product and operating results are published.

Cutoff: 2026-08-27
Sources and original notes
National mineral-exploration programme

Nigeria Geological Survey Agency · Five-state target programme

Nigeria briefing
Study only Current at August 202615 targets selected Exploration result, not reserve or mine capacity

The programme creates a useful national evidence base, but its public page mixes rare metals with pegmatite exploration. Project-level drilling and tests showing the ore can produce a saleable material are needed before any target enters a supply forecast.

Cutoff: 2026-08-27
Sources and original notes
Lovozersky mining complex

Rosatom Mining · Murmansk region

Russia briefing
Producing now 2025 output reported 20 March 20265,800 tonnes of loparite concentrate Actual 2025 mineral concentrate, not rare-earth oxide; 12,000-tonne-a-year target for 2030

Russia's only loparite mine provides the real mining and early-processing base. The double-output plan depends on mine reconstruction and the ore-upgrading plant reaching steady output.

Cutoff: 2026-08-27
Sources and original notes
Solikamsk existing chemical chain

Solikamsk Magnesium Plant, Rosatom · Perm region

Russia briefing
Producing now Process status in 2024 annual report published 2025Mixed rare earth concentrate Also recovers titanium, niobium and tantalum products

The plant is a genuine operating processor, but the rare earth stream remains collective rather than a complete slate of individual magnet oxides.

Cutoff: 2026-08-27
Sources and original notes
  • Rosatom Mining Division Annual Report 2024Rosatom Mining Division Annual Report 2024 , Rosatom Mining, 2025. Lovozero and Solikamsk process chain, collective rare earth product and individual separation development.
Solikamsk separation expansion

Solikamsk Magnesium Plant, Rosatom · Perm region

Russia briefing
Study only 2028 completion target reported 18 March 2026Individual products: 2,500 tonnes a year Maximum planned output, shifted from the earlier 2027 schedule

The project is intended to split La, Ce, Nd and Pr products from the current mixed stream. State review, construction, trial production and purity data remain.

Cutoff: 2026-08-27
Sources and original notes
Glazov NdFeB plant

Rosatom Metal Tech and TVEL · Udmurtia

Russia briefing
Study only Contract announced 14 February 2024Magnet capacity of 1,000 tonnes a year by 2028 Maximum planned output, possible 3,000 tonnes a year after 2030

A full-cycle magnet line would close a major domestic gap. Its proof is annual sales of customer-approved material and dependable separated feed, not the contract capacity alone.

Cutoff: 2026-08-27
Sources and original notes
Tomtor

Vostok Engineering, controlled by Rosneft · Yakutia

Russia briefing
Stopped or blocked India sample talks reported 16 June 202611.4-million-tonne ore reserve Probable reserve at 14.5% total rare-earth oxide, not annual production

High grade does not overcome the unbuilt seasonal logistics and remote processor. Full Rosneft control adds a major U.S. sanctions barrier, while sample talks remain far below finance or construction.

Cutoff: 2026-08-27
Sources and original notes
Phalaborwa rare earths project

Rainbow Rare Earths 85%, with option over the remaining 15% · Phalaborwa, Limpopo

South Africa briefing
Testing output Detailed study update 1 July 20261,850 tonnes a year of NdPr oxide Plus planned Dy/Tb within a grouped heavy-rare-earth product

The project avoids conventional mining and targets separated product. Final separation-circuit design, permits and full funding still gate the 2028 production target.

Cutoff: 2026-08-27
Sources and original notes
  • PhalaborwaPhalaborwa , Rainbow Rare Earths, Current at 27 August 2026. Resource, product design, recovery, infrastructure and schedule.
  • Update on the Phalaborwa Rare Earths Project DFSUpdate on the Phalaborwa Rare Earths Project DFS , Rainbow Rare Earths, 1 July 2026. Engineering status in the detailed study and solvent-extraction status.
TechMet financing for Phalaborwa

U.S. International Development Finance Corporation (DFC) and TechMet · Portfolio investment supporting South Africa

South Africa briefing
Partly funded DFC commitment announced 24 October 2024Up to US$50 million equity TechMet investment, not full project funding

DFC's commitment gives Phalaborwa U.S. policy backing. The public summary still expected the project to require a much larger total funding package.

Cutoff: 2026-08-27
Sources and original notes
Steenkampskraal Phase 1

Steenkampskraal Holdings and Bora Mining Investments · Western Cape

South Africa briefing
Testing output Trial production scheduled August 202613,400 tonnes a year of concentrate Target above 50% total rare-earth oxide at full design rate

The plant was described as substantially complete, with Industrial Development Corporation (IDC) funding in place. Commercial output was not confirmed by the 27 August cut-off.

Cutoff: 2026-08-27
Sources and original notes
Steenkampskraal and Mintek process work

Steenkampskraal Monazite Mine and Mintek · South Africa laboratory programme

South Africa briefing
Evidence limited Result released 23 June 2026High-purity mixed product Laboratory result, not commercial throughput

The programme shows that local ore upgrading chemistry can work on samples. Scale-up and continuous radioactive-waste controls remain unresolved.

Cutoff: 2026-08-27
Sources and original notes
Steenkampskraal Phase 2 and 3

Steenkampskraal Monazite Mine · Western Cape

South Africa briefing
Study only Sequence current at August 2026No funded capacity disclosed Later mixed product and separated oxides

The company plan adds cracking before eventual element separation. Its web dates are stale in places, while strategic finance and National Nuclear Regulator approval remain live gates.

Cutoff: 2026-08-27
Sources and original notes
  • Planned Operational PhasesPlanned Operational Phases , Steenkampskraal Monazite Mine, Current at 27 August 2026. Concentrate, cracking and separation sequence; some dates are stale.
  • Steenkampskraal Radiation PresentationSteenkampskraal Radiation Presentation , Steenkampskraal Monazite Mine, 20 October 2023. Thorium and uranium content plus radiation-management context.
South Africa-EU minerals partnership

South African government and European Union · National programme

South Africa briefing
Study only Memorandum of understanding signed 20 November 2025No rare earth capacity assigned Broader critical-minerals partnership

The partnership favors domestic processing and can support infrastructure. It should not be counted as project finance until a named rare earth facility receives capital.

Cutoff: 2026-08-27
Sources and original notes
Southeast Asia raw-material base

POSCO International and partners · Malaysia and Laos

South Korea briefing
Study only Company plan published 24 March 2026About 4,500 tonnes a year of planned supply Separation and refining products across two countries

POSCO presents the base as raw-material supply for a wider chain. The figure remains forecast capacity until projects disclose operating processing lines and recurring product.

Cutoff: 2026-08-27
Sources and original notes
POSCO-ReElement US venture

POSCO International and ReElement · United States, site to be finalised

South Korea briefing
Study only Agreement announced 22 May 2026Stage-one separation capacity: 3,000 tonnes a year Separation capacity, expandable to 6,000 tonnes a year

The partners target pilot production in late 2027 and commercial output in 2028. The US$200 million plan is material, although site, feed qualification and construction execution remain open.

Cutoff: 2026-08-27
Sources and original notes
LS Eco Energy Vietnam plant

LS Eco Energy with proposed Lynas feed · Vietnam

South Korea briefing
Study only Reported 25 March 2026Samarium metal in the first stage No public comparable annual product capacity

LS targeted operations for the fourth quarter of 2026. Definitive supply and cross-investment agreements still needed negotiation, so the schedule is exposed to slippage.

Cutoff: 2026-08-27
Sources and original notes
JS Link Kuantan magnet plant

JS Link with Lynas investment and feed · Kuantan, Malaysia

South Korea briefing
Funded, work not started Agreement reported 6 July 20263,000 tonnes a year of neodymium-iron-boron (NdFeB) magnets Maximum planned sintered-magnet output

Lynas will invest about A$50 million and supply material through January 2038. The project has a clearer feed and capital route than many magnet announcements, with trial production still to be demonstrated.

Cutoff: 2026-08-27
Sources and original notes
Per Geijer

LKAB · Kiruna, Norrbotten

Sweden briefing
Study only Resource update 30 March 20262.2 million tonnes of rare-earth oxide in the ground Contained in an inferred mineral resource, not annual output or reserve

Existing Kiruna infrastructure is a major advantage. A concession, environmental permit, rights-compatible design, reserve study, full construction funding and formal approval to build remain before construction.

Cutoff: 2026-08-27
Sources and original notes
Luleå demonstration plant

LKAB · Luleå Industrial Park

Sweden briefing
Under construction Permit granted 26 May 2026Demonstration scale Targeted operation by the end of 2026

The demo can validate recovery of phosphorus and rare earths from apatite. Continuous run data and product quality, not mechanical completion alone, will decide whether it supports a commercial build.

Cutoff: 2026-08-27
Sources and original notes
Malmberget apatite plant

LKAB · Gällivare, Norrbotten

Sweden briefing
Waiting for money or permits Ruling 15 June 2026; appeal disclosed 13 August 2026Apatite feed for Luleå Full-scale feed route, not current rare earth output

The environmental ruling includes the feed plant but was under appeal at the cut-off. A final permit, full construction funding, formal approval to build and construction remain distinct gates.

Cutoff: 2026-08-27
Sources and original notes
ReeMAP commercial scale-up

LKAB · Malmberget and Luleå

Sweden briefing
Study only 2030s timing in annual report published 23 April 2026Mixed rare earth oxide concentrate No final commercial capacity disclosed in the current plan

The demonstration plant is intended to provide the technical basis. Feed permits, a commercial study, individual separation route and finance must line up before full-scale.

Cutoff: 2026-08-27
Sources and original notes
Norra Kärr

Leading Edge Materials and Greenna Mineral · Jönköping County

Sweden briefing
Study only Government decision 27 June 20265,340 tonnes a year of mixed rare-earth oxide 2021 early study case, not current guidance or production

The concession moves the project forward, but a full environmental permit, Natura 2000 protected-habitat review, updated study, offsite processing plan, full construction funding and formal approval to build remain.

Cutoff: 2026-08-27
Sources and original notes
Ngualla mine and concentrator

Shenghe-controlled Mamba Minerals; Tanzania 16% free-carried · Songwe Region

Tanzania briefing
Waiting for money or permits Ownership completed 30 September 202516,200 tonnes a year of total rare-earth oxide Contained in planned concentrate under the 2022 study

The ore reserve and licence are established. No formal post-takeover approval to build, full construction funding or main construction notice was found by 27 August 2026, so the output remains a design case.

Cutoff: 2026-08-27
Sources and original notes
Ngualla enabling works

Mamba Minerals · Ngualla site and access corridor

Tanzania briefing
Study only Resettlement plan status reported 14 March 2025No commercial tonnes Hydrology, airstrip and access work

Peak disclosed compensation scheduling and early site tasks before the takeover. Completion under Shenghe needs fresh evidence because preparatory work does not equal main construction.

Cutoff: 2026-08-27
Sources and original notes
Mamba Refinery option

Shenghe-controlled former Peak group · Tanzania, site not finally sanctioned

Tanzania briefing
Study only No public sanction by 27 August 2026No defined capacity Potential domestic intermediate or oxide route

A refinery entity exists in the ownership structure, while the binding commercial route still awards Shenghe all concentrate. Treat domestic separation as an option until a site, budget and construction decision are published.

Cutoff: 2026-08-27
Sources and original notes
  • Scheme Booklet for the proposed acquisition by ShengheScheme Booklet for the proposed acquisition by Shenghe , Peak Rare Earths, ASX, 11 August 2025. Strategic-process history, ownership structure and reasons other bidders withdrew.
  • Annual Report to shareholdersAnnual Report to shareholders , Peak Rare Earths, 2024. Seven-year terms requiring payment even if the buyer takes less for concentrate and downstream products.
Wigu Hill

Tanzanian state control after Montero expropriation dispute · Morogoro Region

Tanzania briefing
Stopped or blocked International arbitration case discontinued 31 March 2025No current production case US$27 million settlement completed

Tanzania paid the final settlement instalment in March 2025 and the arbitration was discontinued. The episode is a live reminder that licence stability affects the cost of capital long after a dispute ends.

Cutoff: 2026-08-27
Sources and original notes
Fungoni and Tajiri mineral sands

Shenghe through Nyati Mineral Sands · Tanzanian coast

Tanzania briefing
Evidence limited Portfolio status disclosed 30 May 2025No rare earth tonnes disclosed Heavy-mineral-sands assets, not Ngualla output

Shenghe said Fungoni had started operations and Tajiri resettlement valuation was nearly complete. The assets add local logistics and government experience, but they should not be counted as rare earth supply.

Cutoff: 2026-08-27
Sources and original notes
Magnequench Korat

Neo Performance Materials · Nakhon Ratchasima

Thailand briefing
Producing now Capacity disclosed 10 March 2022; operating footprint checked August 20261,800 tonnes a year NdFeB powder and compound capacity

Korat is the strongest documented Thai rare earth manufacturing asset. Its powder feeds components made in later factory steps, but the capacity is neither mine output nor a finished sintered-magnet total.

Cutoff: 2026-08-27
Sources and original notes
Xinyuan Rare Earth Thailand

Chinese-linked ownership in the last USGS asset record · Ban Khai, Rayong

Thailand briefing
Current status unverified USGS 2020-2021 industry record; fresh verification needed in 20263,000 tonnes a year of oxides Older planned or reported capacity; 2,000 tonnes a year of metals and alloys also cited

The old yearbook gives a useful asset lead, not proof of current output ready to sell. A current licence and owner should precede any operating label. A production filing would settle the output question.

Cutoff: 2026-08-27
Sources and original notes
Kabin Buri chemical processing plant

Enuo; Hastings pursuing a 49% interest · Prachinburi

Thailand briefing
Waiting for approvals Quarterly update authorized 24 July 202612,000 tonnes a year of mixed rare-earth chloride Gross mixed chloride design from 10,000 tonnes a year of African monazite feed

The expanded design and feed agreement create a defined route. Transaction close and licence changes still sit ahead of trial production, with the first quarter of 2027 as the company target.

Cutoff: 2026-08-27
Sources and original notes
Southern tin-tailings prospects

Thailand Department of Mineral Resources (DMR) inventory and various legacy mine areas · Southern Thailand

Thailand briefing
Study only DMR sources accessed 27 August 2026No reserve or annual-output case Monazite and xenotime in placer or tailings systems

Occurrences are well documented, while no current published national mine record ties them to the USGS 4,800-tonne estimate.

Cutoff: 2026-08-27
Sources and original notes
  • Rare-Earth Element Resources in ThailandRare-Earth Element Resources in Thailand , Thailand Department of Mineral Resources, DMR library record accessed 27 August 2026. Tin-tailings, weathered-granite and Western Belt geology.
  • MonaziteMonazite , Thailand Department of Mineral Resources, Accessed 27 August 2026. Thai occurrence, tin-placer association and natural radioactivity.
Jarin tin deposit rare earth by-product

Jarin tin operation and research partners · Kanchanaburi

Thailand briefing
Study only Study published 3 May 2024No commercial rare earth output Accessory monazite and xenotime

The minerals occur in the tin system, though recovery and product economics remain unproven. It belongs in exploration rather than supply.

Cutoff: 2026-08-27
Sources and original notes
Mountain Pass mine and separation complex

MP Materials · Mountain Pass, California

United States briefing
Producing now Status filed 26 February 2026Concentrate and separated NdPr oxide The only US rare earth mine operating at this scale

The complex produced 50,692 tonnes of rare-earth oxide in concentrate during 2025. Separated NdPr output reached 2,599 tonnes, so the processing line reaching steady output remains the key operating test.

Cutoff: 2026-08-27
Sources and original notes
Independence and 10X magnet program

MP Materials · Fort Worth and Northlake, Texas

United States briefing
One plant operating; one planned Status filed 26 February 2026Integrated NdFeB magnets Metal, alloy and magnet steps brought together

Independence started industrial magnet manufacturing in December 2025 and is being expanded toward 3,000 tonnes a year. The planned 10X facility adds 7,000 tonnes, with trial production expected in 2028.

Cutoff: 2026-08-27
Sources and original notes
White Mesa rare earth circuit

Energy Fuels · Blanding, Utah

United States briefing
Producing now; expansion building Construction update 29 July 2026NdPr now; Dy and Tb planned Monazite processing inside an existing licensed mill

The current circuit is designed for up to 1,000 tonnes of NdPr oxide a year. Construction of commercial heavy separation began in July 2026, while the larger phase-two expansion remains a project rather than operating capacity.

Cutoff: 2026-08-27
Sources and original notes
San Marcos magnet plant

Noveon Magnetics · San Marcos, Texas

United States briefing
Producing now Financing update 19 January 2026Sintered NdFeB magnets Uses both mined and recycled magnetic material

Noveon closed a US$215 million financing round to expand US production. Its binding Nidec agreement runs for five years. Potential volume exceeds 1,000 tonnes, evidence of customer demand rather than a factory rating alone.

Cutoff: 2026-08-27
Sources and original notes
Stillwater and Blacksburg magnet buildout

USA Rare Earth · Oklahoma and South Carolina

United States briefing
Testing output; expansion planned Latest site announcement 2 June 2026Sintered NdFeB magnets and alloy A staged domestic manufacturing network

Stillwater is targeting 600 tonnes a year by the fourth quarter of 2026. Blacksburg is designed for 6,400 tonnes of magnets a year, with trial production targeted for 2028.

Cutoff: 2026-08-27
Sources and original notes
Round Top heavy rare earth project

USA Rare Earth · Hudspeth County, Texas

United States briefing
Study only Quarterly update 10 August 2026Potential heavy rare earth feed No commercial mine output yet

The company expects its definitive feasibility study in late 2026 and targets commercial production in late 2028. Both dates are corporate targets, and neither should be counted as current mine supply.

Cutoff: 2026-08-27
Sources and original notes
VAC Sumter magnet facility

Vacuumschmelze, proposed acquisition by Energy Fuels · Sumter, South Carolina

United States briefing
Producing now Acquisition agreement announced 23 June 2026NdFeB and SmCo permanent magnets An experienced producer inside a proposed integrated group

The facility has 2,000 tonnes of annual permanent-magnet capacity. Energy Fuels describes it as scalable to 12,000 tonnes. The VAC acquisition was not complete at the data cut-off, so the expansion remains contingent.

Cutoff: 2026-08-27
Sources and original notes
Dong Pao

Vietnamese state mineral framework; development partner unresolved · Lai Chau

Vietnam briefing
Study only Master-plan asset; no sustained commercial output by August 2026No audited tonnes a year Academic resource is not current production

Dong Pao has substantial light rare earth-rich geology but no demonstrated operating mine. A transparent award and study detailed enough for lenders remain ahead. Financing would follow them.

Cutoff: 2026-08-27
Sources and original notes
Bac Nam Xe and Nam Nam Xe

Vietnamese state mineral framework · Lai Chau

Vietnam briefing
Study only Included in 2023 master plan; status checked August 2026No verified commercial output Monazite and bastnaesite systems

Mineralogy supports more technical work, while no current filing demonstrates a financed commercial plant. Planning-list inclusion should stay out of operating capacity.

Cutoff: 2026-08-27
Sources and original notes
Yen Phu and Vietnam Rare Earth processing

Thai Duong Group and Vietnam Rare Earth JSC · Yen Bai

Vietnam briefing
Stopped or blocked Arrests October 2023; wider case July 2024No current audited output Flagship local processing route suspended

The case involved alleged unlicensed ore trade and forged tax records. Reuters later reported Vietnam Rare Earth suspended, so prior partnerships do not establish a current operating chain.

Cutoff: 2026-08-27
Sources and original notes
Shin-Etsu Magnetic Materials Vietnam

Shin-Etsu Chemical · Hai Phong

Vietnam briefing
Producing now Operating since 2016; annual report update July 20252,200 tonnes a year of magnets Announced capacity after expansion, not current utilization

The plant integrates refining or recycling with pressing and sintering. Its industrial value is established, though feed origin should not be assumed to be Vietnamese ore.

Cutoff: 2026-08-27
Sources and original notes
LS Eco Energy rare earth metal plant

LS Eco Energy with preliminary Lynas cooperation · Ho Chi Minh City area

Vietnam briefing
Study only Agreement reported 25 March 2026; company target: fourth quarter of 2026Capacity not disclosed Initial samarium metal from imported Lynas oxide

The route could supply non-Chinese samarium-cobalt magnet supply chains sooner than a Vietnamese mine opens. A preliminary agreement and year-end target remain below commercial production until batches ready to sell ship.

Cutoff: 2026-08-27
Sources and original notes

Method, citation and change record

The first edition extracts structured project cards and Australia's project table from the existing country briefings. It retains the original reporting cutoffs and source notes, including source dates where they were supplied. The downloadable records include the source-file checksum for reproducibility. Compilation does not represent a new review of the primary documents.

Cite as: EarthRarest, Rare earth projects tracker, compilation 19 October 2026, with the relevant row's original data cutoff and primary source. Do not remove a product or financing qualification when quoting a row.

19 October 2026: first consolidated edition; no source claim refreshed. The table has no automatic update schedule. A later refresh should identify changed rows and their new evidence. For national mine output, see production by country.